Infrastructure

  • Home
  • Infrastructure

  •   Melting

    • 33" Divided Blast Cupola (TERI) Capacity - 6 Tons/hr.
    • Induction Melting Furnace: Capacity - 500 Kgs
    • Induction Holding Furnace: Capacity - 2000 Kgs
    • Over Head Cranes having 15 Tons lifting capacity.
  •   Moulding

    • No Bake Mould System
    • CO2 Mould System
    • Greensand Mould System
    • Molasses Mould System
    • Dry Sand hand Moulding System
    • Supply of controlled compressed air at all stages.
  •   Core System

    • No Back Core Facilities
    • CO2 Core Facilities
    • Dry Sand Core Facilities
  •   Shot Blasting, Fettling & Finishing

    • Bench Grinders
    • Flexible Grinders
    • Coating/ Painting Shop
  •   Machine Shop

    • Plano Miller
    • Planner
    • Planner Type Slideway Surface Grinder
    • Radial Drilling Machine.
    • Lathe Machine
    • Side and Face Milling Machine
    • Shaping Machine
  •   Heat treatment shop

    • Induction Hardening M/c
    • Flame Hardening M/c
  •   Testing Facilities

    • Carbon Equivalent Analyzer at each furnace
    • Mould Hardness Tester
    • Surface Hardness Tester
    • Spectrometer
    • Microscope
    • UTM
  •   Other Facilities

    • Pattern Shop for maintenance of our customers Patterns